SMC Networks SMCRPU14 Uživatelský manuál Strana 23

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 38
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 22
2-3
Mounting
RPU units can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
Rack Mounting
Before rack mounting the unit, pay particular attention to the following
factors:
Temperature: Since the temperature within a rack assembly may be
higher than the ambient room temperature, check that the
rack-environment temperature is within the specified operating
temperature range.
Mechanical Loading: Do not place any equipment on top of a
rack-mounted unit.
Circuit Overloading: Be sure that the supply circuit to the rack
assembly is not overloaded.
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than
direct connections to the mains.
Zobrazit stránku 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 37 38

Komentáře k této Příručce

Žádné komentáře